I like to sneak in here every now and then and post a build update for those that are watching. Here is the latest, with all of the plumbing finally complete. I'm wiring this week, and should be able to fire up the motor early next week (if all goes well - it never seems to though). Among the photos I'm including are the engine bay (getting busy in there), the CO2 system (for controlling the air shifter and wastegate), a view from the drivers seat, one of the Firefox fire nozzles (there are five in the engine bay, one in the cockpit), and last but not least - the beginning of my wiring nightmare. I hope you enjoy - the next update should be the finished product.