I ordered a novi 2000 for a 99 cobra. Then during the install we realized that it had a gt pulley on it so it rubbed my valve cover.
so it takes paxton 3 days to get back to me with an RA number and they will only pay for ground shipping. They also acted like it was my fault for some reason. so approximately 3 weeks ago i sent the blower back to cali from jersey. Now it should take about 5 to 6 business days to get there. So i figured it arrived the week before last. They said it would take 3 days to swap from a gt pulley to a cobra pulley(approx 20 minutes of work). So i figured that it would leave last week wednesday or thursday and then be here tomorrow or friday. However, when i called this morning for a tracking number, they told me they only shipped it out this morning, meaning it took them around a week to swap a single pulley. So basically this means i won't see the blower for another week/week and a half.
So 4 weeks or more will go by from the time i started the install till i get the blower back. I don't know what takes them so long. Also, since it was their mistake I feel like they should try and hurry. I mean i had dyno time and everything.
Im not flaming im just wondering wtf is taking them so long to get it moving. Its their fault, you would think they would try and get it back asap. I have been patient but my patience is running out.
thoughts, comments, opinions?
Bookmarks